Retaining Wall Construction

Vaucluse, NSW

Construction Cost: $270k+

October, 2023

Unit 6 was located at the bottom of the building with external walls of the unit located below the external ground level. Each time there was a heavy rain event the unit would be flooded. The committee had made previous attempts to stop the water leaks, but nothing was working.
A contractor recommended us to the strata committee, and we reviewed the site and reported problems, with the only recommended solution was the construction of a large retaining wall in front of the unit to move the soil away from the external building walls.